Surat and Bowen Basins
Field Development Construction
Project Overview

CPECC Nacap JV (CNJV) are proud to be supporting Arrow Energy’s requirement to expands its assets in the Surat and Bowen Basins and provide critical infrastructure to meet East Coast gas demand.

CNJV works include construction, pre-commissioning and commissioning as required by Arrow Energy. Works encompass permanent facilities sites related to the construction and operation of the gathering networks; including valve stations, wellhead separators, wellheads, LV/HV buried, overhead cable and dam infrastructure.

read more
Key Achievements

Construction of some urgent residual field works for A109, A132 & A120 surface well completions

Construction of the A122 Hopelands Pilot Gas Pipeline and sub surface facilities.