The facts
Project overview
Key Achievements
Industry Sectors
The Facts
Pre-construction minor works
Investigative site survey works
Preliminary geotechnical survey
Establishment of site access tracks
Temporary laydown area
Project Overview

The proposed Flyers Creek Wind Farm is located approximately 20 km southwest of Orange (Blayney Shire) in NSW and has an expected capacity of approximately 110-145 MW comprising up to 38 wind turbines, a substation, access tracks and an electrical collection system.

The owner is Infigen (ASX: IFN), a leading Australian Securities Exchange (ASX) listed energy market participant delivering energy solutions to Australian businesses and large retailers.

Nacap has been appointed in consortium with Quanta sister company Consolidated Power Projects (CPP) to deliver the pre-construction minor works scope.

These works enable detailed design and construction of the Project to proceed once a final investment decision has been made.

The early works include:

  • Investigative site survey works in relation to the approved 33kV power line on Errowanbang Road and the approved access tracks, laydown areas and substation
  • Preliminary geotechnical survey of the approved wind turbine locations
  • Establishment of site access tracks, a temporary laydown area and a temporary site office, all of which are to be located off Errowanbang Road near the intersection with Halls Road.
read more
Key Achievements

Completion of early works pre-construction minor works scope.