Projects

From Concept to Completion, Together

Innovative Solutions, Seamless Delivery

Nacap, part of the global Quanta family, delivers seamless collaboration, ensuring no interface risks, reduced costs, and a single point of accountability. Our commitment to Early Contractor Involvement fosters trust and delivers end-to-end project solutions for optimal outcomes. Through our Capacity Model™, we prioritise human performance, building resilience to fail safely while maintaining industry-leading accreditations.

Energy Transition

Kiata Wind Farm – Vestas

Engineering, procurement and construction of Kiata Wind Farm, civil balance of Plant encompassing 9 wind turbine foundations, access roads and crane pads in Nhill, Victoria.

Energy Transition

Lincoln Gap Wind Farm – Senvion

Engineering, procurement and construction of Lincoln Gap Wind Farm, civil balance of Plant consisting of 59 wind turbine foundations, access roads and HV cable in Port Augusta South Australia.

Energy Transition

Agnew Wind Farm – EDL

Engineering, procurement and construction of Agnew Wind Farm, civil balance of Plant consisting of 5 wind turbine foundations, access roads and EBoP in Leinster, Western Australia.

Energy Transition

SEA CCS, Co2 pipeline ECI – Esso

Early contractor involvement to support FEED for the Co2 pipeline. The scope was providing constructability input for the design of the pipeline consisting of crossings, right of way design, route planning, cost estimate and program.

Infrastructure

Tindal Jet Fuel Storage Tanks – U.S. Department of Defense

Construction of two cut-and-cover 4 million litre bulk jet fuel storage tanks, aircraft fuel truck fill stand, fuel unloading stand, pump houses, filter building, and associated roadways at RAAF Base Tindal, Northern Territory.

Infrastructure

Darwin Jet Fuel Storage Tanks – U.S. Department of Defense

Construction of two cut-and-cover 8 million litre bulk jet fuel storage tanks, aircraft fuel truck fill stand, connections to existing fuel farms and ancillary services, pump houses, filter building, laboratory, and associated roadways at RAAF Base Darwin, Northern Territory.

Infrastructure

Victorian Desalination Project – AquaSure

Construction of major water trunk pipeline, 84km ~2m diameter. The scope included major pressure reducing station, fibre optic cable and 87km of 220kV HVAC below ground cable from Wonthaggi to Berwick and Cranbourne, Victoria.

Infrastructure

Wimmera Mallee Pipeline System 5 – GWMWater

Engineering, procurement and Construction of 840 km of regional water pipelines, 4 storage facilities (tanks and ponds), 5 water pump stations and an inlet filtration facility in Swan Hill Victoria.

Resources

Northern Goldfields Interconnect – APA

Construction of 580 km, 12 inch gas transmission pipeline from Dampier Bunbury Natural Gas Pipeline to the Goldfields Gas Pipeline, in Western Australia.

Resources

Big Lake Gas Pipeline – Santos

Construction of 22 km, 20 inch gas transmission pipeline from Big Lake Gas Satellite to Moomba Plant for processing in Moomba South Australia.

Resources

Atlas to Reedy Creek – Senex

Construction of 56 km, 12 inch gas transmission pipeline from Atlas East CPF to APLNG’s Reedy Creek Facility in Wandoan, Queensland.

Resources

QSN3 – Epic Energy

Construction of 938 km, 18 inch gas transmission pipeline and facilities from Wallumbilla to Moomba, Queensland.

Resources

Port Kembla Import Gas Pipeline – Jemena

Construction of Hydrogen ready gas transmission pipeline and facilities, 12 km, 18 inch from the gas import terminal to Easter Gas Pipeline in Port Kembla, New South Wales.

Resources

Gathering Network Program (MSA) – Arrow Energy

Construction of CSG gathering program consisting of 285 wellheads, 470 km of gas & water HDPE gathering pipelines ranging from DN110 to DN800 across both the Surat and Bowen basins, Queensland.

Papua New Guinea

Kutubu Refinery repair and upgrade – Santos

Engineering and construction of the refinery repair and upgrade including replacement of the existing process equipment with a modular packages, Balance of Plant, installation of condensate reinjection pipeline and Tie-in works in Southern Highlands of PNG.

Papua New Guinea

Hegigio Bridge deconstruction FEED – Santos

Delivery of FEED to assess earthquake damage to Hegigio Gorge Pipeline Bridge, spanning ~470 metres over the 400m deep gorge. The overall objective of the project was to remove the bridge structure safely in the Southern Highlands Province, PNG.

Papua New Guinea

Angore – Wood (ExxonMobil)

Construction and pre-commissioning of 11.3 km 14 inch gas transmission pipeline, 2 inch MEG pipeline and associated in line and end of line facilities from Angore to the Hides Gas conditioning plant, PNG.

Papua New Guinea

Security Hardening FEED – Santos

Delivery of security fencing across existing operation sites in PNG. The scope was security fencing of the existing operation sites in PNG. The key phases of the scope included concept selection and FEED.
Testimonials

What our Clients Have to Say

"A key success for this project was the adoption of early contractor involvement (ECI) to address key risks prior to works starting on site. By engaging Nacap as the ECI partner, it significantly assisted our project planning and execution to manage risks, and in some cases, de-risk key activities."
Jemena
Port Kembla Gas Pipeline and End of Lines Facilities
"The cooperation shown by Nacap throughout the entire project from the Early Contractor Involvement (ECI) phase through construction activities and into commissioning and completion has been of the highest standard. At all times the work between Epic and Nacap has been transparent and honest, more akin to an alliance style contract than a typical construction relationship."
Epic Energy
QSN Link
"We couldn’t be happier with the Nacap team. They are not only experts at delivering on the job, they are also extremely pleasant to work with. They really added value by getting involved very early to step through administrative challenges and agree to the scope of works before the project even began."
Santos
Big Lake Gas Pipeline

Successfully Navigating the Most Challenging Urban, Rural and Remote Locations