Projects
Innovative Solutions, Seamless Delivery
Nacap, part of the global Quanta family, delivers seamless collaboration, ensuring no interface risks, reduced costs, and a single point of accountability. Our commitment to Early Contractor Involvement fosters trust and delivers end-to-end project solutions for optimal outcomes. Through our Capacity Model™, we prioritise human performance, building resilience to fail safely while maintaining industry-leading accreditations.
- ISO accredited for Occupational Health and Safety, Quality and Environment
- Federal Safety Commission Accredited
- NATA accredited for hydrostatic testing of pipelines and related facilities
Kiata Wind Farm – Vestas
Engineering, procurement and construction of Kiata Wind Farm, civil balance of Plant encompassing 9 wind turbine foundations, access roads and crane pads in Nhill, Victoria.
Lincoln Gap Wind Farm – Senvion
Engineering, procurement and construction of Lincoln Gap Wind Farm, civil balance of Plant consisting of 59 wind turbine foundations, access roads and HV cable in Port Augusta South Australia.
Agnew Wind Farm – EDL
Engineering, procurement and construction of Agnew Wind Farm, civil balance of Plant consisting of 5 wind turbine foundations, access roads and EBoP in Leinster, Western Australia.
SEA CCS, Co2 pipeline ECI – Esso
Early contractor involvement to support FEED for the Co2 pipeline. The scope was providing constructability input for the design of the pipeline consisting of crossings, right of way design, route planning, cost estimate and program.
Tindal Jet Fuel Storage Tanks – U.S. Department of Defense
Construction of two cut-and-cover 4 million litre bulk jet fuel storage tanks, aircraft fuel truck fill stand, fuel unloading stand, pump houses, filter building, and associated roadways at RAAF Base Tindal, Northern Territory.
Darwin Jet Fuel Storage Tanks – U.S. Department of Defense
Construction of two cut-and-cover 8 million litre bulk jet fuel storage tanks, aircraft fuel truck fill stand, connections to existing fuel farms and ancillary services, pump houses, filter building, laboratory, and associated roadways at RAAF Base Darwin, Northern Territory.
Victorian Desalination Project – AquaSure
Construction of major water trunk pipeline, 84km ~2m diameter. The scope included major pressure reducing station, fibre optic cable and 87km of 220kV HVAC below ground cable from Wonthaggi to Berwick and Cranbourne, Victoria.
Wimmera Mallee Pipeline System 5 – GWMWater
Engineering, procurement and Construction of 840 km of regional water pipelines, 4 storage facilities (tanks and ponds), 5 water pump stations and an inlet filtration facility in Swan Hill Victoria.
Northern Goldfields Interconnect – APA
Construction of 580 km, 12 inch gas transmission pipeline from Dampier Bunbury Natural Gas Pipeline to the Goldfields Gas Pipeline, in Western Australia.
Big Lake Gas Pipeline – Santos
Construction of 22 km, 20 inch gas transmission pipeline from Big Lake Gas Satellite to Moomba Plant for processing in Moomba South Australia.
Atlas to Reedy Creek – Senex
Construction of 56 km, 12 inch gas transmission pipeline from Atlas East CPF to APLNG’s Reedy Creek Facility in Wandoan, Queensland.
QSN3 – Epic Energy
Construction of 938 km, 18 inch gas transmission pipeline and facilities from Wallumbilla to Moomba, Queensland.
Port Kembla Import Gas Pipeline – Jemena
Construction of Hydrogen ready gas transmission pipeline and facilities, 12 km, 18 inch from the gas import terminal to Easter Gas Pipeline in Port Kembla, New South Wales.
Gathering Network Program (MSA) – Arrow Energy
Construction of CSG gathering program consisting of 285 wellheads, 470 km of gas & water HDPE gathering pipelines ranging from DN110 to DN800 across both the Surat and Bowen basins, Queensland.
Kutubu Refinery repair and upgrade – Santos
Engineering and construction of the refinery repair and upgrade including replacement of the existing process equipment with a modular packages, Balance of Plant, installation of condensate reinjection pipeline and Tie-in works in Southern Highlands of PNG.
Hegigio Bridge deconstruction FEED – Santos
Delivery of FEED to assess earthquake damage to Hegigio Gorge Pipeline Bridge, spanning ~470 metres over the 400m deep gorge. The overall objective of the project was to remove the bridge structure safely in the Southern Highlands Province, PNG.
Angore – Wood (ExxonMobil)
Construction and pre-commissioning of 11.3 km 14 inch gas transmission pipeline, 2 inch MEG pipeline and associated in line and end of line facilities from Angore to the Hides Gas conditioning plant, PNG.